Brooklyn Bridge
Project Description:
The ramps and approaches to the Brooklyn Bridge were being replaced with precast concrete slabs as part of a $500 million rehabilitation. With more than 120,000 vehicles and 4,000 pedestrians crossing the structure every day, the project required a highperformance, quick-turnaround product in order to minimize the disruption of traffic flow.
View the Project Profile
Products Used
-
Slab Dowel Grout
A non-shrink, high compressive strength, non-metallic grout used for placing prefabricated concrete pavements and typical structural.
View Details